SKATE — Precision You Can Trust

Export Packaging & Logistics

Built to Survive Global Freight

Every window and door that leaves our factory is packed to withstand multiple handling points, ocean transit, and customs inspection — engineered specifically for the dimensions and weight of each shipment.

Film Wrap

Every unit is wrapped in protective film to guard the frame and glazing surface against scuffing during handling and transit.

Corner Protectors

Rigid corner protectors absorb impact at the most vulnerable points of each frame during loading, stacking, and transport.

Foam Interlayers

Foam interlayers separate stacked units and glazing surfaces, preventing contact damage and vibration wear during ocean freight.

Steel-Strapped Plywood Crates

Export orders are crated in steel-strapped plywood frames engineered for the weight and dimensions of each shipment, built to survive multiple handling points.

Container Loading Plans

We prepare a loading plan for every container to maximize space utilization and minimize movement in transit, matched to your delivery sequence.

45-60 Days

Typical Production Lead Time

30+

Export Countries

FCL / LCL

Full & Partial Container Options

100%

Documented Shipments

From Order Confirmation to Port Arrival

Every export order follows the same structured process, with full documentation and photographic traceability at every stage.

01

Order Confirmation

Specifications, quantities, and delivery terms are confirmed and production scheduling begins.

02

Production

Units move through extrusion, coating, glass, and assembly under our 3-stage quality control process.

03

QC & Pre-Shipment Photos

Finished units undergo final inspection with photographic records provided before crating begins.

04

Crating & Loading

Units are packed per product-specific protection standards and loaded to the container plan.

05

Bill of Lading & Docs

Packing list, certificate of origin, test reports, and bill of lading are prepared and sent for customs clearance.

06

Port Arrival Support

Our export team remains available to support customs queries and documentation questions on arrival.

Frequently Asked Questions

  • Typical production lead time is 45-60 days from order confirmation, depending on product mix and customization complexity, plus ocean or air freight transit time to your destination port.

Get a landed-cost quote including packaging and shipping.

Request a Quote →