Export Packaging & Logistics
Built to Survive Global Freight
Every window and door that leaves our factory is packed to withstand multiple handling points, ocean transit, and customs inspection — engineered specifically for the dimensions and weight of each shipment.
Film Wrap
Every unit is wrapped in protective film to guard the frame and glazing surface against scuffing during handling and transit.
Corner Protectors
Rigid corner protectors absorb impact at the most vulnerable points of each frame during loading, stacking, and transport.
Foam Interlayers
Foam interlayers separate stacked units and glazing surfaces, preventing contact damage and vibration wear during ocean freight.
Steel-Strapped Plywood Crates
Export orders are crated in steel-strapped plywood frames engineered for the weight and dimensions of each shipment, built to survive multiple handling points.
Container Loading Plans
We prepare a loading plan for every container to maximize space utilization and minimize movement in transit, matched to your delivery sequence.
45-60 Days
Typical Production Lead Time
30+
Export Countries
FCL / LCL
Full & Partial Container Options
100%
Documented Shipments
From Order Confirmation to Port Arrival
Every export order follows the same structured process, with full documentation and photographic traceability at every stage.
Order Confirmation
Specifications, quantities, and delivery terms are confirmed and production scheduling begins.
Production
Units move through extrusion, coating, glass, and assembly under our 3-stage quality control process.
QC & Pre-Shipment Photos
Finished units undergo final inspection with photographic records provided before crating begins.
Crating & Loading
Units are packed per product-specific protection standards and loaded to the container plan.
Bill of Lading & Docs
Packing list, certificate of origin, test reports, and bill of lading are prepared and sent for customs clearance.
Port Arrival Support
Our export team remains available to support customs queries and documentation questions on arrival.
Frequently Asked Questions
Typical production lead time is 45-60 days from order confirmation, depending on product mix and customization complexity, plus ocean or air freight transit time to your destination port.